User Manual: Introduction & Overview¶
Welcome to the practical user manual for the Stromnetz Pro. This manual is aimed at machinists, squad leaders, group leaders, and incident commanders in disaster response and emergency management who are responsible for establishing, operating, and monitoring temporary power supply grids.
🎯 Purpose of the App¶
In disaster management and emergency response, a reliable power supply is vital. In complex grids with multiple power generators, hundreds of meters of cabling, and dozens of consumers, it is easy to lose track of:
- Phase imbalance / unbalance (overloading individual windings on the generator),
- Impermissible voltage drops over long feed cables (risk of equipment failure or cable fires),
- Remaining fuel runtime and timely refueling intervals,
- Material tracking and location in the operational area.
The Stromnetz Pro digitizes and automates these tasks directly on site using standard Android devices – fully offline-capable and mesh-networked.
🧭 Structure of the Documentation & Operational Guides¶
The operational documentation for the Stromnetz Pro is divided into two practical tools:
- Complete User Manual (12 Technical Chapters & Appendices):
Comprehensive documentation of all features, from mission setup, load calculation, and fuel logistics to grid configuration and P2P mesh networking. - Machinist Field Guide / Pocket Card (
Stromnetz_Pro_Pocket_Guide_EN.pdf):
Compact 4-page quick reference (DIN A4 double-sided / DIN A5 folded) for immediate on-site deployment at the generator with DIN VDE limits, cable guidelines, emergency triage, and 5-phase SOP.
Both guides are available digitally directly within the app (via the Manual & Help menu) and as print-optimized PDF documents in the docs/ directory.
⚠️ Important Safety Instructions¶
Electrical Safety & DIN VDE Regulations
The Stromnetz Pro is a calculation and documentation tool. It does not replace mandatory inspections according to DGUV Regulation 3, compliance with DIN VDE 0100, or the professional responsibility of qualified electricians (EFK) or electrically instructed persons (EuP). Prior to commissioning any grid, required protective measures (e.g., insulation monitoring or RCD testing) must always be verified by measurement.