Chapter 12: Material Pool & Inventory Management

In major disaster operations with multiple sectors or large tent cities, maintaining an accurate overview of available and deployed material is mission-critical. The Material Pool & Inventory module links target vehicle inventory specifications with actual field deployment.


🎯 Purpose & Concept of Inventory Management

The app strictly differentiates between two levels:

  1. Templates & Material Pool (Target Inventory): All devices, cable reels, distributors, and generators permanently assigned to the unit, including specified storage compartment locations (e.g., Compartment G1, Power Container, Cable Box 3).
  2. Active Operational Grid (Deployed Stock): All components currently wired and operating in the grid plan.

The app reconciles both data sources in real time and calculates three key figures for every piece of equipment:

Available Remaining Stock = Total Stock (Target) − Deployed in Grid (Actual)

flowchart TD
    subgraph Pool ["Vehicle Stock / Master Data"]
        T["Template Catalog<br>(e.g. 10x Cable 2.5 mm² 50m)"]
    end

    subgraph Mission ["Active Grid Model"]
        A["Deployed in Grid<br>(e.g. 7x active in grid)"]
    end

    Pool --> IM["Automatic<br>Stock Calculation"]
    Mission --> IM

    IM --> UI["Inventory Dashboard<br>• Total: 10<br>• Deployed: 7<br>• Available in vehicle: 3<br>• Storage: Compartment G2"]

📋 Inventory Overview in Field Operations

Open Inventory via the drawer menu:

Column / Metric Meaning Field Utility
Designation & Type Material name (Generator, Cable, Distributor, Consumer). Unambiguous identification according to unit labeling.
Storage Location Physical storage compartment on vehicle (e.g., Compartment G3). Rapid retrieval for crew members without searching.
Total Target quantity loaded on vehicle. Verification of completeness during loading.
Deployed Number of items currently wired in grid plan. Proof of committed equipment.
Available Free remaining quantity on vehicle. Instant clarity on whether additional material must be requested.

🔄 Operational Workflows & Dismantling Checklist

Material management accompanies the full incident lifecycle:

  • SOP Phase 1: Departure & Staging Area: Verify complete loading of vehicle compartments via the inventory list.
  • SOP Phase 2: Cable Deployment & Setup: Live stock updates as components are placed in grid plan – immediate overview of vehicle reserves.
  • SOP Phase 5: Dismantling & Loss Prevention: Systematic inventory check during teardown – ensures no equipment is left behind in mud or dark terrain.

📋 SOP Phase 5: Dismantling Checklist

To reliably avoid costly equipment loss during teardown, the app guides operators through a standardized audit:

flowchart TD
    Step1["1. Ordered Load Shedding<br>Switch off & disconnect consumers"] --> Step2["2. Grid Teardown<br>Remove distributors & cables in grid plan"]
    Step2 --> Step3["3. Automatic Inventory Audit<br>Actual vs. Target stock on dashboard"]
    Step3 --> Step4{"All items accounted for?<br>(Available == Total)"}
    Step4 -- "Yes (100% complete)" --> Step5["🟢 Full completeness confirmed<br>Cleared for departure"]
    Step4 -- "No (red discrepancy)" --> StepWarn["🔴 Loss Alert!<br>Missing material located with compartment ID"]
    StepWarn --> StepSearch["Targeted search at incident site"]
    StepSearch --> Step3

    style Step5 fill:#dcfce7,stroke:#10b981,stroke-width:2px;
    style StepWarn fill:#fee2e2,stroke:#ef4444,stroke-width:2px;
  1. Isolation & Load Shedding: Switch off consumers step-by-step from non-essential to vital and de-energize feeder cables.
  2. Topological Teardown: As cable reels are rolled up and distributors removed, delete or disconnect components in the grid plan.
  3. Live Target vs Actual Audit: The app updates the Available column. As items are rolled up and stowed, available count increments.
  4. Locating Missing Items: If an item displays a red discrepancy (e.g. Cable 50m CEE 16A: Total 6, Available 5, Deployed 1), the crew leader immediately knows one drum is still lying in the field and can search for it using the recorded cabling route.
  5. Clearance & Documentation: The mission is formally closed in the system only after full stowage is confirmed.