Chapter 12: Material Pool & Inventory Management¶
In major disaster operations with multiple sectors or large tent cities, maintaining an accurate overview of available and deployed material is mission-critical. The Material Pool & Inventory module links target vehicle inventory specifications with actual field deployment.
🎯 Purpose & Concept of Inventory Management¶
The app strictly differentiates between two levels:
- Templates & Material Pool (Target Inventory): All devices, cable reels, distributors, and generators permanently assigned to the unit, including specified storage compartment locations (e.g., Compartment G1, Power Container, Cable Box 3).
- Active Operational Grid (Deployed Stock): All components currently wired and operating in the grid plan.
The app reconciles both data sources in real time and calculates three key figures for every piece of equipment:
Available Remaining Stock = Total Stock (Target) − Deployed in Grid (Actual)
flowchart TD
subgraph Pool ["Vehicle Stock / Master Data"]
T["Template Catalog<br>(e.g. 10x Cable 2.5 mm² 50m)"]
end
subgraph Mission ["Active Grid Model"]
A["Deployed in Grid<br>(e.g. 7x active in grid)"]
end
Pool --> IM["Automatic<br>Stock Calculation"]
Mission --> IM
IM --> UI["Inventory Dashboard<br>• Total: 10<br>• Deployed: 7<br>• Available in vehicle: 3<br>• Storage: Compartment G2"]
📋 Inventory Overview in Field Operations¶
Open Inventory via the drawer menu:
| Column / Metric | Meaning | Field Utility |
|---|---|---|
| Designation & Type | Material name (Generator, Cable, Distributor, Consumer). | Unambiguous identification according to unit labeling. |
| Storage Location | Physical storage compartment on vehicle (e.g., Compartment G3). | Rapid retrieval for crew members without searching. |
| Total | Target quantity loaded on vehicle. | Verification of completeness during loading. |
| Deployed | Number of items currently wired in grid plan. | Proof of committed equipment. |
| Available | Free remaining quantity on vehicle. | Instant clarity on whether additional material must be requested. |
🔄 Operational Workflows & Dismantling Checklist¶
Material management accompanies the full incident lifecycle:
- SOP Phase 1: Departure & Staging Area: Verify complete loading of vehicle compartments via the inventory list.
- SOP Phase 2: Cable Deployment & Setup: Live stock updates as components are placed in grid plan – immediate overview of vehicle reserves.
- SOP Phase 5: Dismantling & Loss Prevention: Systematic inventory check during teardown – ensures no equipment is left behind in mud or dark terrain.
📋 SOP Phase 5: Dismantling Checklist¶
To reliably avoid costly equipment loss during teardown, the app guides operators through a standardized audit:
flowchart TD
Step1["1. Ordered Load Shedding<br>Switch off & disconnect consumers"] --> Step2["2. Grid Teardown<br>Remove distributors & cables in grid plan"]
Step2 --> Step3["3. Automatic Inventory Audit<br>Actual vs. Target stock on dashboard"]
Step3 --> Step4{"All items accounted for?<br>(Available == Total)"}
Step4 -- "Yes (100% complete)" --> Step5["🟢 Full completeness confirmed<br>Cleared for departure"]
Step4 -- "No (red discrepancy)" --> StepWarn["🔴 Loss Alert!<br>Missing material located with compartment ID"]
StepWarn --> StepSearch["Targeted search at incident site"]
StepSearch --> Step3
style Step5 fill:#dcfce7,stroke:#10b981,stroke-width:2px;
style StepWarn fill:#fee2e2,stroke:#ef4444,stroke-width:2px;
- Isolation & Load Shedding: Switch off consumers step-by-step from non-essential to vital and de-energize feeder cables.
- Topological Teardown: As cable reels are rolled up and distributors removed, delete or disconnect components in the grid plan.
- Live Target vs Actual Audit: The app updates the Available column. As items are rolled up and stowed, available count increments.
- Locating Missing Items: If an item displays a red discrepancy (e.g. Cable 50m CEE 16A: Total 6, Available 5, Deployed 1), the crew leader immediately knows one drum is still lying in the field and can search for it using the recorded cabling route.
- Clearance & Documentation: The mission is formally closed in the system only after full stowage is confirmed.