Chapter 9: PDF Mission Reports & Export¶
After deployment or during shift handovers, operational services, fuel consumption, and electrical grid stability must be fully documented.
📄 Mission Reports at the Touch of a Button¶
The Stromnetz Pro includes a built-in vector PDF engine that generates standard A4 reports in emergency response corporate design locally on device without external cloud services.
Tap Mission Reports in the drawer:
- Progress Report: For status updates or shift changes during ongoing operations.
- Final Report: Upon mission completion with final evaluations of operating hours and fuel usage.
📑 Complete Scope of PDF Mission Reports¶
The internal PDF engine generates auditable documents following official emergency service standards:
flowchart LR
classDef box fill:#f8fafc,stroke:#003399,color:#0f172a,stroke-width:1.5px;
classDef center fill:#dbeafe,stroke:#003399,stroke-width:2px;
subgraph In ["Captured Mission Data"]
D1["Grid Topology & Metrics"]:::box
D2["Fuel & Operating Hours"]:::box
D3["Event & Switching Log"]:::box
end
Gen["📄 PDF Report Generator<br>(Offline on Device)"]:::center
subgraph Out ["A4 Mission Report"]
R1["Cover & Mission Metadata"]:::box
R2["Overall Tech Status & Load Profile"]:::box
R3["Unbalance & Voltage Drop Logs"]:::box
R4["Refueling Logs & Bill of Materials"]:::box
end
D1 --> Gen
D2 --> Gen
D3 --> Gen
Gen --> R1
Gen --> R2
Gen --> R3
Gen --> R4
Report Sections Overview:¶
- Cover Page & Metadata:
- Mission name, location / geocoordinates, responsible incident commander / group leader.
- Assigned unit preset.
- Exact mission start and end timestamps.
- Overall Technical Status:
- Calculated peak active power (kW), maximum apparent power (kVA), average load.
- Phase loading (L1, L2, L3) across total mission duration.
- Phase Unbalance & Voltage Drop Log:
- Documentation of DIN VDE 0100-520 compliance (\(\Delta U \le 3.0\%\)).
- Complete log of temporary threshold exceedances with timestamps and corrective actions.
- Refueling Log:
- Table of all refueling events with pre-/post-fill levels and fuel added.
- Logged operator signatures/names.
- Aggregated total fuel volume consumed for cost reimbursements.
- Detailed Bill of Materials:
- Full inventory of cable drums, CEE cables, distribution boxes, and power panels used in the field.
- Proof of committed material for inventory tracking and recovery.
🖨️ Direct Printing via Android PrintManager (PdfPrintDocumentAdapter)¶
For immediate paper prints in mobile command posts or tents, the app integrates native direct printing:
- No Third-Party PDF Viewer Needed: Integrates directly with the Android Print Framework via
PdfPrintDocumentAdapter. - Supported Printers:
- Mobile Wi-Fi and Wi-Fi Direct printers in command vehicles.
- Mobile Bluetooth thermal printers for quick handovers.
- Network and USB printers.
- Automatic Pagination: A4 portrait layout with page margins and headers/footers.
💾 Additional Export Formats & Data Exchange¶
In addition to PDF reports, the app provides export interfaces for external software:
| Format | Operational Purpose | Included Data |
|---|---|---|
| Mission proof, audit readiness & handover | Complete graphic A4 mission report with diagrams. | |
| CSV | Administrative post-processing & accounting | Raw refueling, operating hour, and material quantity data for spreadsheets. |
| JSON | Interoperability with command systems | Machine-readable dataset for command information systems or backup/restore. |
| SVG / HTML | Single Line Diagram (SLD) large prints | Vector single-line electrical schematic for large plotters and wall maps. |