Zum Inhalt

Chapter 9: PDF Mission Reports & Export

After deployment or during shift handovers, operational services, fuel consumption, and electrical grid stability must be fully documented.


📄 Mission Reports at the Touch of a Button

The Stromnetz Pro includes a built-in vector PDF engine that generates standard A4 reports in emergency response corporate design locally on device without external cloud services.

Tap Mission Reports in the drawer:

  • Progress Report: For status updates or shift changes during ongoing operations.
  • Final Report: Upon mission completion with final evaluations of operating hours and fuel usage.

📑 Complete Scope of PDF Mission Reports

The internal PDF engine generates auditable documents following official emergency service standards:

flowchart LR
    classDef box fill:#f8fafc,stroke:#003399,color:#0f172a,stroke-width:1.5px;
    classDef center fill:#dbeafe,stroke:#003399,stroke-width:2px;

    subgraph In ["Captured Mission Data"]
        D1["Grid Topology & Metrics"]:::box
        D2["Fuel & Operating Hours"]:::box
        D3["Event & Switching Log"]:::box
    end

    Gen["📄 PDF Report Generator<br>(Offline on Device)"]:::center

    subgraph Out ["A4 Mission Report"]
        R1["Cover & Mission Metadata"]:::box
        R2["Overall Tech Status & Load Profile"]:::box
        R3["Unbalance & Voltage Drop Logs"]:::box
        R4["Refueling Logs & Bill of Materials"]:::box
    end

    D1 --> Gen
    D2 --> Gen
    D3 --> Gen
    Gen --> R1
    Gen --> R2
    Gen --> R3
    Gen --> R4

Report Sections Overview:

  1. Cover Page & Metadata:
  2. Mission name, location / geocoordinates, responsible incident commander / group leader.
  3. Assigned unit preset.
  4. Exact mission start and end timestamps.
  5. Overall Technical Status:
  6. Calculated peak active power (kW), maximum apparent power (kVA), average load.
  7. Phase loading (L1, L2, L3) across total mission duration.
  8. Phase Unbalance & Voltage Drop Log:
  9. Documentation of DIN VDE 0100-520 compliance (\(\Delta U \le 3.0\%\)).
  10. Complete log of temporary threshold exceedances with timestamps and corrective actions.
  11. Refueling Log:
  12. Table of all refueling events with pre-/post-fill levels and fuel added.
  13. Logged operator signatures/names.
  14. Aggregated total fuel volume consumed for cost reimbursements.
  15. Detailed Bill of Materials:
  16. Full inventory of cable drums, CEE cables, distribution boxes, and power panels used in the field.
  17. Proof of committed material for inventory tracking and recovery.

🖨️ Direct Printing via Android PrintManager (PdfPrintDocumentAdapter)

For immediate paper prints in mobile command posts or tents, the app integrates native direct printing:

  • No Third-Party PDF Viewer Needed: Integrates directly with the Android Print Framework via PdfPrintDocumentAdapter.
  • Supported Printers:
  • Mobile Wi-Fi and Wi-Fi Direct printers in command vehicles.
  • Mobile Bluetooth thermal printers for quick handovers.
  • Network and USB printers.
  • Automatic Pagination: A4 portrait layout with page margins and headers/footers.

💾 Additional Export Formats & Data Exchange

In addition to PDF reports, the app provides export interfaces for external software:

Format Operational Purpose Included Data
PDF Mission proof, audit readiness & handover Complete graphic A4 mission report with diagrams.
CSV Administrative post-processing & accounting Raw refueling, operating hour, and material quantity data for spreadsheets.
JSON Interoperability with command systems Machine-readable dataset for command information systems or backup/restore.
SVG / HTML Single Line Diagram (SLD) large prints Vector single-line electrical schematic for large plotters and wall maps.