Zum Inhalt

Chapter 8: Tactical Map & QR Codes

In complex operational areas (e.g., flooded districts spanning multiple streets, major fires, or tent cities), geographic mapping of power generators, cabling routes, and distributors is essential for rapid response.


🗺️ Tactical Map (Offline MBTiles)

The built-in tactical map enables working with completely offline maps in the open MBTiles standard:

flowchart LR
    MapServer["Map Sources<br>OpenStreetMap & CartoDB"] --> Download["MBTiles Download<br>(Region or Custom BBox)"]
    Download --> ZIP["ZIP Export to USB / SD Card"]
    ZIP --> Transfer["ZIP Import on Field Tablets<br>(100% offline in field)"]
    Transfer --> Map["🗺️ Tactical Map<br>(No cell network required)"]

1. Preparing & Managing Offline Maps

In Settings → Mission Tools → Offline Maps:

  • Map Sources: High-resolution vector and raster tiles from OpenStreetMap (OSM) and CartoDB (Dark / Light / Positron themes for night or bright sunlight).
  • Region Downloads: One-click download of prepared MBTiles packages.
  • Custom Bounding Box: Define custom bounding boxes via geocoordinates or rectangle selection for the operation zone.
  • Tile Cache Cleanup: Clear temporary tiles to free storage space.
  • Offline ZIP Export & Import: Export map packages as .zip archives and share them via USB drive or SD card in the staging area – zero internet needed!

2. Georeferenced Markers & Distance Measurement

  • Automatic GPS Positioning: Center button locates the machinist using device GPS (ACCESS_FINE_LOCATION).
  • Tactical Symbols:
  • ⚡ Power Generator: Tactical power symbol with status indicator (Green = Online, Red = Fault).
  • 🔀 Distributors: Junction node icons displaying distribution branch topology.
  • 🌊 / 💡 Consumers: Distinct markers for pumping stations, floodlights, and command posts.
  • Distance & Cable Route Measurement:
  • Draw and measure cabling paths directly on the map.
  • Calculate required cable lengths (\(25\,\text{m}\) vs \(50\,\text{m}\) drums) before laying cables in difficult terrain.

📷 QR Code Workflow in the Staging Area

To avoid manual typing with cold fingers or heavy gloves, the Stromnetz Pro features an end-to-end QR Code System:

sequenceDiagram
    autonumber
    actor M as Machinist / Depot
    actor H as Crew Member in Field
    participant QR as QR Generator
    participant Cam as Camera Scanner
    participant Core as TopologyEngine

    M->>QR: Before deployment: Create equipment QR codes in generator
    QR-->>M: Generate standardized QR code (TYPE;NAME;VALUE;EXTRA)
    M->>M: Print, laminate & attach code to cable drum
    Note over M,H: Dispatch to incident location
    H->>Cam: In field: Open camera scanner in Grid Plan
    Cam-->>H: Scan QR code on cable drum
    Cam->>Core: Auto-import (H07RN-F, 2.5 mm², 50m, CEE 16A)
    Core-->>H: Instant integration into grid model & VDE evaluation

Step-by-Step Workflow:

  1. Depot Preparation:
  2. Integrated QR Generator & Labels: Equipment officers can generate standardized QR codes and equipment labels directly within the app under the QR Generator menu.
  3. Batch Processing: Equipment templates can be pre-configured and assigned to cable reels, distributors, and generators with standardized parameters.
  4. Standardized QR codes follow the format TYPE;NAME;VALUE;EXTRA (e.g. CABLE;Cable 50m CEE 16A;2.5;50).
  5. Labeling Equipment:
  6. Print codes on weatherproof labels, laminate them, and attach them to drums, distributor enclosures, or generator panels.
  7. Instant Grid Onboarding:
  8. On site, tap the camera icon in the Grid Plan.
  9. Scan the code: Cable type, cross-section, length, and plug type are read accurately and inserted into the grid plan.