Chapter 5: Grid Plan & Automatic Load Calculation

The Grid Plan (Topology Screen) is the visual core of the Stromnetz Pro. It renders your entire electrical network as an interactive hierarchical tree – from feeding power generators at the root through distribution nodes down to individual end-point consumers at the leaf nodes.


🌳 The Interactive Grid Tree

Open the Grid Plan via the menu or bottom bar:

graph TD
    classDef gen fill:#dbeafe,stroke:#003399,stroke-width:2px;
    classDef vert fill:#e2e8f0,stroke:#64748b,color:#0f172a;
    classDef ok fill:#dcfce7,stroke:#10b981,color:#065f46;
    classDef warn fill:#fee2e2,stroke:#ef4444,color:#991b1b,stroke-width:2px;

    Gen["⚡ Generator 50 kVA<br>Online (42 kW / 68%)"]:::gen
    Gen -->|"Cable C1: 50m / 6.0 mm²<br>ΔU: 0.8% OK"| V1["🔀 Main Box V1 (CEE 32A)"]:::vert
    Gen -->|"Cable C4: 10m / 16.0 mm²<br>ΔU: 0.2% OK"| Sani["🚨 Medical Tent (Vital / 4.5 kW)"]:::ok
    V1 -->|"Cable C2: 25m / 2.5 mm²<br>ΔU: 2.1% OK"| Pumpe["🌊 Submersible Pump (3-phase 3.2 kW)"]:::ok
    V1 -->|"Cable C3: 75m / 1.5 mm²<br>⚠️ ΔU: 3.8% TOO HIGH!"| Licht["💡 Light Tower (1-phase L1 16A)"]:::warn

Every element in the tree displays its live status:

  • Generator Node: Current feed power, phase load, and operating status.
  • Cable Node: Cross-section, length, and calculated voltage drop \(\Delta U\%\).
  • Consumer Node: Power draw, assigned phase (L1 / L2 / L3), and priority badge.

🖐️ Dual Topology Concept: Reconfiguration vs. 2D Canvas

The app strictly separates two specialized working views:

  1. Tree & Kanban View (TopologyScreen) – Logical Reconfiguration:
    Used for hierarchical and functional grid structuring. Operators move loads, cables, and distributors between supply points via intuitive Drag & Drop. When dropped onto a new target node, the topology engine recalculates all branch currents, phase loads, and cumulative voltage drops in real time.
  2. 2D Canvas (NodeCanvasScreen) – Spatial Field Layout:
    Used for geographical positioning of equipment on a free-zoom 2D canvas. Nodes can be arranged exactly as positioned on site (e.g. generator at dike foot, distributor on road, floodlight at slope edge), providing command staff with an immediate spatial situation picture.

Drag & Drop Operation:

  • Long Press the component to move (distributor or consumer).
  • Drag to the desired target node (distributor or generator).
  • Drop: The grid model rewires components seamlessly and instantly validates phase balance and voltage drop.

📷 Fast Equipment Setup via QR Code (MaterialQrParser)

Equipment can be added directly from the grid plan via camera scan:

  • Tapping the camera icon opens the built-in scanner.
  • The MaterialQrParser reads encoded equipment parameters in fractions of a second:
  • Cables: Cable type (e.g. H07RN-F), cross-section (\(2.5\,\text{mm}^2\)), length (\(50\,\text{m}\)), connector type (CEE 16A / Schuko).
  • Distributors: Inlet rating, number and phase layout of outlets.
  • Generators: Apparent power rating (kVA), rated current, and tank volume.
  • The component is wired into the selected grid location without manual typing.

⚡ DIN VDE Voltage Drop Evaluation (DIN VDE 0100-520)

According to DIN VDE 0100 Part 520, cumulative voltage drop between the feeding generator and the furthest consumer during normal operation must not exceed 3.0% (max 6.9 V at 230 V / 12.0 V at 400 V).

Stromnetz Pro Threshold Levels:

Voltage Drop \(\Delta U\) Status Color DIN VDE Status Recommendation
\(\Delta U \le 3.0\%\) 🟢 Green Optimal Operation Fully compliant. No action required.
\(3.0\% < \Delta U \le 5.0\%\) 🟡 Yellow Marginal Operation Monitor voltage drop. Prepare larger cross-section if adding loads.
\(\Delta U > 5.0\%\) 🔴 Red Non-Compliant Immediate Intervention! Risk of undervoltage; increase cross-section or relocate generator!

Calculation Formulas:

  • 1-Phase AC (230 V):
    $\(\Delta U [\%] = \frac{2 \cdot L \cdot I \cdot \cos\varphi}{\kappa \cdot A \cdot U_n} \cdot 100\%\)$

  • 3-Phase AC (400 V symmetric):
    $\(\Delta U [\%] = \frac{\sqrt{3} \cdot L \cdot I \cdot \cos\varphi}{\kappa \cdot A \cdot U_n} \cdot 100\%\)$

  • \(L\) = One-way cable length in meters (m)

  • \(I\) = RMS current in Amperes (A)
  • \(\cos\varphi\) = Power factor (default 0.8)
  • \(\kappa\) (Kappa) = Electrical conductivity (Copper: \(\kappa = 56\,\frac{\text{m}}{\Omega \cdot \text{mm}^2}\))
  • \(A\) = Cable cross-section in \(\text{mm}^2\)
  • \(U_n\) = Nominal voltage (\(230\,\text{V}\) / \(400\,\text{V}\))

📐 Single Line Diagram (SLD) Export (SvgSldExporter)

For submission to incident commanders, technical advisors, or documentation, the app exports the entire grid plan as a standardized Single Line Diagram (SLD):

  • Vector SVG & Standalone HTML: Scalable for large-format plotters in command tents.
  • Standardized Symbols: Electrical symbols according to DIN EN 60617 for generators, breakers, cables, and loads.
  • Full Data Labels: Displays cable cross-sections (\(A\)), lengths (\(L\)), branch currents (\(I\)), voltage drops (\(\Delta U\)), and loop impedances (\(Z_s\)) at each node.

🛠️ Immediate Corrective Actions for Voltage Drop Warnings

When a cable is flagged in yellow or red (\(\Delta U > 3.0\%\)), machinists can take immediate action:

  1. Uncoil coiled cable reels: Eliminates heat trap and reduces conductor resistance.
  2. Increase cross-section & shorten length: Replace cable with a larger gauge (\(1.5\,\text{mm}^2 \to 2.5\,\text{mm}^2\) or \(4.0\,\text{mm}^2\)) or pick a shorter route.
  3. Move load: Drag & drop high-power consumers to a less loaded distribution branch.
  4. Relocate feed point: Move generator closer to load centers.

🚨 Prioritized Load Shedding Assistant during Generator Overload

If unexpected load surges or inrush currents overload a generator (> 100% rated capacity or severe phase unbalance > 30%), the app activates the Prioritized Load Shedding Assistant:

  1. Automated Emergency Banner: A prominent alert banner appears directly on the grid topology screen displaying the overload magnitude in kW and percentage.
  2. Prioritized Triage Dialog (LoadSheddingDialog): Tapping the banner displays immediate disconnect recommendations sorted strictly by assigned circuit priorities:
  3. ⚪ Sheddable (SHEDDABLE): First to disconnect (e.g. coffee machines, auxiliary space heaters).
  4. 🔷 Normal (NORMAL): Second to disconnect (e.g. floodlight balloons, secondary tool battery chargers).
  5. 🔶 Essential (HIGH): Only disconnect in extreme emergencies (e.g. high-capacity drainage pumps).
  6. 🚨 Vital (VITAL): Never recommended for disconnection (e.g. medical tents, tactical communication repeaters).
  7. Step-by-Step Recovery: For each proposed consumer disconnection, the app dynamically previews the resulting grid capacity until generator loading returns safely below \(90\%\).

⚡ 100 m Cable Length Limit in IT Systems

In ungrounded IT networks without automatic insulation shutdown monitoring, safety standards limit total cumulative cable length to 100 meters to avoid hazardous touch voltages caused by capacitive leakage currents:

  • The calculation engine continuously aggregates cumulative cable length per IT generator.
  • Exceeding 100 m triggers an immediate warning banner on the topology and dashboard screens.