Zum Inhalt

Chapter 2: Mission Creation & Management

Every deployment begins with a new mission order. In the Stromnetz Pro, the Mission is the central data container for all power generators, cables, distributors, and consumers in use.


➕ Creating a New Mission

When opening the app without an active mission, the Mission Creation Dialog appears immediately. This ensures that no generator is operated without clear mission context, auditability, and logging.

Entering Mission Data:

  1. Mission Name / Keyword: e.g., “Flood Level South – Assembly Area”.
  2. Location / Address: Exact address or geocoordinates of the incident location.
  3. Start Time: Pre-filled by default with the current timestamp.
  4. Predefined Mission Scenarios / Templates (MissionScenario): For immediate operational readiness, scenarios can be pre-configured and selected here.
  5. Tap “Start Mission”.

Data Security & AES-256 Column Encryption

All sensitive mission data – such as commander names, exact locations, radio call signs, and tactical notes – are stored in the local database encrypted with AES-256. Unauthorized reading in case of device loss in the field is strictly prevented.


⏱️ The 5-Phase SOP Workflow

The app guides commanders and machinists through all phases of an incident:

flowchart LR
    classDef step fill:#f8fafc,stroke:#003399,color:#0f172a,stroke-width:2px;

    P1["<b>1. Preparation</b><br>• Select unit<br>• Check inventory<br>• Load offline maps"]:::step
    --> P2["<b>2. Deployment</b><br>• Create mission<br>• Ground generators<br>• Cables & QR scan"]:::step
    --> P3["<b>3. Inspection</b><br>• Check ΔU ≤ 3.0%<br>• Balance phases<br>• Document RCD"]:::step
    --> P4["<b>4. Operation</b><br>• Dashboard / Monitor<br>• P2P mesh sync<br>• Record refueling"]:::step
    --> P5["<b>5. Dismantling</b><br>• Close mission<br>• Export PDF report<br>• Inventory audit"]:::step

📊 Mission Dashboard

The Dashboard is the operational control center for machinists and crew leaders. It is divided into four core dashboard cards:

flowchart TD
    Header["🖥️ MISSION: Flood Level South | Fullscreen Monitor"]

    subgraph G1 ["Real-Time Telemetry & Generator"]
        C1["⚡ MissionStatsCard<br><b>42.5 kW / 48.0 kVA</b><br>Load: 68% | Phase balance"]
        C2["⚙️ GeneratorDashboardCard<br><b>Generator 50 kVA (Online)</b><br>Tank: 65 L (54%) | Remaining: 4h 15m"]
    end

    subgraph G2 ["Organization & Remote Control"]
        C3["🛡️ UnitCard<br><b>Electrical Power Unit</b><br>Preset: 200 kVA Generator"]
        C4["📬 PendingRequestCard<br><b>1 pending request</b><br>Connect Pump 2"]
    end

    Header --> G1
    Header --> G2
    G1 -.-> Warn["⚠️ WARNING: Voltage drop on line P1-V2 exceeds 3% (3.4%)"]

    style Header fill:#dbeafe,stroke:#003399,stroke-width:2px;
    style C1 fill:#f8fafc,stroke:#94a3b8;
    style C2 fill:#f8fafc,stroke:#94a3b8;
    style C3 fill:#f8fafc,stroke:#94a3b8;
    style C4 fill:#f8fafc,stroke:#94a3b8;
    style Warn fill:#fef2f2,stroke:#ef4444,stroke-width:1.5px;
    style G1 fill:#eff6ff,stroke:#3b82f6,stroke-width:1px;
    style G2 fill:#f1f5f9,stroke:#64748b,stroke-width:1px;

The Four Main Components in Detail:

  1. MissionStatsCard (Overall Technical Status):
  2. Total Active Power (kW) and Apparent Power (kVA) of all currently fed branches.
  3. Grid Load (%): Ratio of current load to installed generator rated power.
  4. Phase Balance (L1, L2, L3 in Amperes): Immediate visual detection of symmetric or asymmetric load distribution.
  5. GeneratorDashboardCard (Generator Status):
  6. Status overview of all power generators (Online, Offline, Overloaded).
  7. Phase load bars with phase unbalance indicator.
  8. Current fuel level in liters and percentage along with projected remaining runtime.
  9. UnitCard (Organizational Assignment):
  10. Shows the active unit (e.g. Electrical Power, Supply Unit, Water Damage / Pumping, Recovery).
  11. Enables quick comparison against the pre-configured equipment package.
  12. PendingRequestCard (Remote Control Queue):
  13. Lists all pending control and load change requests from connected operators.
  14. Enables one-click approval or rejection by the group leader in P2P mesh mode.

🖥️ Fullscreen Monitor Mode

For command tents, mobile command posts, incident command centers, or large wall displays, the app offers a Fullscreen Monitor Mode:

  • Hidden Touch Menus: Navigation bars and editing controls are hidden.
  • Maximum Readability: Font sizes for loads, fuel levels, and warnings are maximized so grid status can be read from meters away on wall displays.
  • Keep Screen On: Prevents display dimming or screen timeout (Wall Display Mode).

🗄️ Closing & Archiving Missions

After dismantling the power supply network, the mission is closed via a security confirmation dialog:

  1. Navigate to Manage Mission via the drawer.
  2. Tap “Close Mission”.
  3. Security Confirmation Dialog:
  4. Enter and confirm actual Mission End Time.
  5. Write-Protection Lock: All generators, distributors, and consumers are immediately locked against accidental edits.
  6. The app finalizes all operating hour and fuel logs and compiles data for the final PDF report.
  7. The completed mission is moved to the Archive where it remains permanently accessible for audits and training reviews.

📋 Operational Event & Note Manager (EventManagerScreen)

For seamless audit trails and logging throughout deployment, the app provides the Event Manager (EventManagerScreen):

  • Chronological Mission Timeline: Logs all generator switching actions, load changes, phase shifts, refuel events, and field notes with timestamps.
  • Manual Retrospective Entry: Add missed or retrospective events via “+ Add Event” with operator name and timestamp.
  • Search & Filters: Instantly filter by generator, consumer, or refueling events to support shift handovers.